Swimming Pool Construction. Step by Step.

 
 

 
 
 
 
 
 
 
 
 
 
 

 

 

 

 
 
 
 
 
First of all the plot is marked in the shape and style as requested by the customer...
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Then the excavation team is introduced... 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
  
 
After the excavation we build the pools body...
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
The frame is built, plumbing and electrics installed...
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
The swimming pool is re-inforced with steel mesh...
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 Fully re-inforced...
 
 
 
 
 
 
 
 
 
 
 
And prepaired for the 'Gunite' concrete spray system... 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
The construction is then sprayed to 30cm thicknes with special concrete and left to dry for 3/4 days (weather permiting)...   
 
 
 
 
 
 
 
 
 
 
 
 
 
 
When the pool is dried and we are satisfied the work of tiling the construction with special 'Gresete' tiles begins...  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
The newly tiled and grouted pool is then prepaired for filling...  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Shower and drain installed...  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Each pool is built to your specification, if you would like any extras, such as a diving board, hand rail, jacuzzi, pool heataing etc... you only have to request it.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
The swimming pool is now filled, cleaned and ready to use!...  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
The pool by night...  
 
 
 
 
 
Enjoy your new pool by CB Construct!